Solar & EV Charger Permits

Solar PV, battery storage, and EV charging. Structural, electrical, and utility interconnection all in one file, with Florida expedited solar permitting available in many jurisdictions.

Who it's for
Solar installers, electrical contractors, homeowners
Turnaround
Filed in 1-2 business days. Many jurisdictions offer expedited residential solar review.
Fee structure
Flat rate, quoted in writing before anything is filed
Cost
Quoted per project once we've seen the scope
01Scope of work

What's included

  • Structural and electrical package assembly
  • Product and equipment documentation
  • Utility interconnection application coordination
  • Expedited solar permitting where the jurisdiction offers it
  • Battery storage permitting
  • EV charger permitting including load calculation documentation
  • Inspection scheduling

What we need from you

  • System design and equipment list
  • Structural letter or engineering where required
  • Contractor license and insurance on file
  • Property and owner information

Missing something on this list? Send what you have. We will tell you what else is needed before you pay anything.

02Sequence of work

How it actually goes

01

Package review

We check the design package against the jurisdiction's solar checklist before filing.

02

Expedited path

Florida law pushed jurisdictions toward faster residential solar permitting. Where an expedited path exists, we use it.

03

File

Structural and electrical filed together so reviews run in parallel instead of in sequence.

04

Interconnection

We coordinate the utility application alongside the permit so they are not sequential delays.

05

Inspect

Final inspection and permission to operate coordination.

03Questions we get

Straight answers

How fast is expedited solar permitting?

It varies by jurisdiction, and not every jurisdiction implements it the same way. Where it is available for qualifying residential systems it is dramatically faster than standard review. We tell you upfront which path your job qualifies for.

Do you handle the utility interconnection?

We coordinate it. The utility application runs on its own track and its own timeline, and starting it late is a common reason a finished system sits unable to turn on.

What about EV chargers?

Usually a straightforward electrical permit, with the main question being whether the existing service can carry the load. A load calculation is often the deciding document.